Yesterday, I was forced to leave the room I've been staying in. Construction debris from the floor above that room fell all over the bed and all the stuff in the room. Fortunately, I was able to remove the television and my phone beforehand.
I guess the demolition has been a long time coming. But since the new rooms of the house are unfinished - there aren't any partitions yet, and not electricity and bathroom - it has been difficult to transfer my things out. It would have been nice if the agreement was followed - before demolishing our old areas, the new areas have to be finished.
And even if you force us to transfer into the new areas - there are a lot of things that need to be done in those areas, which will just force our things out again. After the wall partitions and doors, the lighting and electrical sockets still have to be installed. And then the areas will need a ceiling. And then there's the painting of walls and ceiling.
Things would probably go faster if we pitched in. And in some areas, we have. But some things are best left to the professionals. The work would probably be hindered or slowed down if we ended up getting in their way.
This is the price for lack of foresight. Hopefully, it becomes a lesson ingrained in future decision making.
No comments:
Post a Comment